Technical
LPG

-
Flow 12.5 kg or 35 kg butane
Flow 12.5 kg or 35 kg butane

-
Recommendations
The tubes are placed end-to-end above the trench on supports before assembly by welding. Once the pipe lines have been welded, they must undergo a hydrostatic mechanical

-
Multiple line trenches
Multiple line trenches

-
Trenches under public thoroughfares
Trenches under public thoroughfares

-
Trenches under private roadways
Trenches under private roadways










