Technical
Unit installations
-
Upper and lower openings
These are required by regulations and good practices
-
Connection of appliances
Static appliances (water heater, instantaneous water heater, boiler, etc.) are required to be connected with rigid copper tubes
-
Connection of a cylinder bank
The two inlets located on the ends of the diverter are connected to a copper manifold, 1 for the cylinders in service, 1 for the cylinders in reserve.
-
Restaurant kitchen assembly
Restaurant kitchen assembly
-
Installation of 4 large capacity LPG cylinders
Installation of 4 large capacity LPG cylinders