Facebook Login JavaScript Example
3M Construction Assembling & Trading Co., Ltd

THE MORE PROFESSIONAL, THE SAFER!

  • Tiếng Anh
  • Tiếng Việt
+84 903 815 852 - +84 225 3 564 259

Contact us 24/7

119/81 Nguyen Trai street, Ngo Quyen district, Hai Phong city, Vietnam

Our address

Connection of a cylinder bank

Views: 2096

The  two  inlets  located  on the  ends of the diverter are connected to a copper manifold, 1 for the cylinders in service, 1 for the cylinders  in reserve.

Example of manifold diamater  according  to the number of cylinders:

For 4 cylinders (2in service, 2 in reserve) 14/16 in diameter For 6 cylinders (3 in service, 3 in reserve)20/22 in diameter For 8  cylinders (4 in service, 4 in reserve) 24/26 in diameter

The  diverter’s  outlet  is linked  to a copper  tube that  supplies the  inside installation .

Example  of possible  flow  for a diameter  of 10/12

Length  10 m  possible  flow  15  kg/h of  LPG Length  20 m  possible  flow  11.5  kg/h of  LPG Length  30 m  possible  flow  9  kg/h of  LPG Length  50 m  possible  flow  7  kg/h of  LPG