Facebook Login JavaScript Example
3M Construction Assembling & Trading Co., Ltd

THE MORE PROFESSIONAL, THE SAFER!

  • Tiếng Anh
  • Tiếng Việt
+84 903 815 852 - +84 225 3 564 259

Contact us 24/7

119/81 Nguyen Trai street, Ngo Quyen district, Hai Phong city, Vietnam

Our address

Mechanical resistance and leak tests

Views: 2040

Required to ensure the safety and proper operation of the installation

All lines carrying LPG in the liquid phase must undergo a hydrostatic mechanical resistance test at 1.5 times maximum working pressure (30 bars for propane and 12 bars for butane) followed by a leak test at working pressure.

For lines carrying LPG in the gaseous phase, they must undergo a mechanical resistance test at 1.5 times working pressure with a minimum of 3 bars and have a pressure limiter at the end of OPFE.

If the pressure  limiter is not provided for, the pipe line will need to undergo a hydrostatic mechanical resistance test at 1.5 times maximum working pressure (30 bars for propane and

12 bars for butane) followed by a leak test at working pressure.